From your site details to dismantling.

You tell us what needs to happen and when. TD-S reviews the set-up, prepares the work and takes care of assembly and dismantling.

PreparationSteps 1 to 4
ExecutionSteps 5 to 7
ContactFor quotes and execution
Part of ScafforPart of ScafforPart of ScafforPart of Scaffor
Our approach
First, clarity about the site.

How much preparation is needed depends on the structure. The first questions are always about use, dimensions, access and timing.

01

Discussing the work

What needs to be reached, covered or spanned? Who will use the structure, and what activities take place underneath or next to it?

What this delivers
  • Defined application
  • Initial choice of structure type
02

Reviewing the situation

We assess plans, photos, dimensions and possible support points. Where needed, we look at the situation on site.

What this delivers
  • Required measurements
  • Overview of obstacles
  • Support points to assess
03

Defining the set-up

We choose the structure and discuss phased execution. For a temporary roof, we also consider whether it stays in place or needs to be able to slide.

What this delivers
  • Structure proposal
  • Equipment and phasing
Step 4

A 3D model every time, calculations where the structure requires them.

We make a 3D model for every scaffold and temporary roof. For complex set-ups, we also carry out the necessary load studies. This lets the parties involved discuss the structure and connections before assembly.

  • A 3D model for every set-up.
  • Load studies for complex set-ups.
  • Obstacles and clearance mapped.
  • Preparation of the assembly sequence.
  • Coordination with the parties involved on site.

The calculations and documents required depend on the chosen structure.

Execution

From delivery to collection.

The schedule is matched to when the structure is needed and how the site can be reached.

05

Planning and assembly

We agree on delivery and assembly. The crew builds the prepared set-up and goes through the handover with you.

What this delivers
  • Assembly schedule
  • Agreements on use
06

Periodic site inspections

While the scaffold or temporary roof is in use, we inspect the structure periodically. That way, you can always work safely.

What this delivers
  • Periodic inspection during the works
  • Safe use of the structure
07

Dismantling

You let us know when the structure can come down. We plan the dismantling and the collection of the equipment.

What this delivers
  • Dismantling schedule
  • Collection of equipment
Safety

The structure and its use must match.

Safe execution takes more than a drawing. The site situation, assembly and use during the works are all part of the same preparation.

Knowing the work and the users in advance.
Assessing suitable support points and anchoring.
Reviewing loads and structure technically.
Preparing the assembly sequence.
Discussing agreements on use at handover.
Reporting changes before an adjustment or a change in use.
In practice

What we agree before execution.

Structure proposal

Which set-up we plan and for which work.

Technical design

Which drawings or calculations the structure needs.

Schedule

When delivery and assembly are planned, and how we coordinate later adjustments.

Contact

Who to contact for planning, execution and administration.

Discuss your site in good time?

Request a quote

Send us the information you already have. We’ll look at what else is needed to define the set-up and execution.

Prefer to talk directly?

Get in touch with a question about your request or the planning.